Power: 2MW Energy: 2.6 MWh Use Case: Automatic Frequency Control (AFC) Grid Connection Date: Q3 2023 Status / Location: In Construction/ Chiayi, Taiwan
Power: 3MW Energy: 3.9 MWh Use Case: Automatic Frequency Control (AFC) Grid Connection Date: Q3 2023 Status / Location: In Construction/ Chiayi, Taiwan
Power: 1.9 MW Energy: 2.3 MWh Use Case: Automatic Frequency Control (AFC) Grid Connection Date: Q1 2024 Status / Location: In Construction/ Taitung, Taiwan
Power: 1.9 MW Energy: 2.3 MWh Use Case: Automatic Frequency Control (AFC) Grid Connection Date: Q1 2024 Status / Location: In Construction/ Taitung, Taiwan
Power: 3.6MW Energy: 4.6 MWh Use Case: Automatic Frequency Control (AFC) Grid Connection Date: Q4 2023 Status / Location: In Construction/ Penghu, Taiwan