EPC PROJECTS

DIVERSE PORTFOLIO OF ESS DEPLOYMENTS AND PROJECT EXECUTION

TPE ENERGY

Power: 2MW
Energy: 3.15 MWh
Use Case: Automatic Frequency Control (AFC)
Grid Connection Date: Q2 2021
Status / Location: In Service/ Zhongli, Taiwan

IN-HOUSE ESS PROJECT

Power: 1MW
Energy: 1.3 MWh
Use Case: Demo Site
Grid Connection
Date: Q4 2022
Status / Location: In Service / Luzhu, Taiwan

ATE ENERGY

Power: 2MW
Energy: 2.6 MWh
Use Case: Automatic Frequency Control (AFC)
Grid Connection Date: Q3 2023
Status / Location: In Construction/ Chiayi, Taiwan

HUA GUO ENERGY

Power: 3MW
Energy: 3.9 MWh
Use Case: Automatic Frequency Control (AFC)
Grid Connection Date: Q3 2023
Status / Location: In Construction/ Chiayi, Taiwan

BEI-JIE ENERGY

Power: 1.9 MW
Energy: 2.3 MWh
Use Case: Automatic Frequency Control (AFC)
Grid Connection Date: Q1 2024
Status / Location: In Construction/ Taitung, Taiwan

BEI-JIE ENERGY

Power: 1.9 MW
Energy: 2.3 MWh
Use Case: Automatic Frequency Control (AFC)
Grid Connection Date: Q1 2024
Status / Location: In Construction/ Taitung, Taiwan

SUPER POWER

Power: 3.6MW
Energy: 4.6 MWh
Use Case: Automatic Frequency Control (AFC)
Grid Connection Date: Q4 2023
Status / Location: In Construction/ Penghu, Taiwan